The above-mentioned cargo damaged at the previous discharging port 上述货物是在前一卸货港损坏的
The above damage caused by the nature of the cargo 上述残损是货物自然特性造成
The cargo damaged before(after) loading (discharging)port 货物的损坏是在装、卸港之前/之后造成的
Damage the cargo reported after discharging 残损货物是在卸后报告的
The ship is not responsible for the above damage 船方对残损货物不负责任
A sea protest has been proclaimed on this voyage, the ship is not responsible for the damage本航次有海事,船方对残损不负责任
Subject to the sea protest 根据海事报告
Subject to the cargo surveyor’s report 以商检报告为准
Deck cargo at shipper’s risk 甲板货由发货人承担责任
Cargo was loaded on the same condition, the ship is not responsible for this 货物装船前如此,船方对此不负责任
According to the record on the spot, only the appearance is damage 根据现场记录,仅仅外表损坏
The ship is not responsible for the shortage 船方对短缺不负责任
The ship does not agree to the above-mentioned shortlanded cargo 船方不同意上述货物短缺
Shortage is due to the off-bundling during discharging by the stevedores 短缺是由于工人卸散捆造成的
According to shore tally figure 根据岸上理货数据
According to the loading(discharging) port figure 根据装、卸港数据
According to the ship’s draft, no cargo shortlanded 根据水尺、没有货物短缺
Not tallied by the ship’s crew 船上未曾理货
All the cargo on board discharged 船上货物全部卸完
Figure in dispute 数字有争异
Short in dispute 短少有争异
Subject to-check 以重理为准
Overtime work 加班工作)
Refer to the remarks from the loading port 参照装货港批注
Cargo discharged as loaded 原装原卸
Incorrect tallying figure 理货数字不准
Loading under raining 雨中装货
Over in dispute 溢多有争异
Sign under disagreement 在异议下签字
Rejected 拒签
Overtime payment 加班费
Sign for sailing 为开航签字
Sign under protest 被迫签字